<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Fencing Archives - WTL Group</title>
	<atom:link href="https://wtlgroup.co.uk/division/fencing/feed/" rel="self" type="application/rss+xml" />
	<link>https://wtlgroup.co.uk/division/fencing/</link>
	<description>Building Beyond Boundaries</description>
	<lastBuildDate>Fri, 05 Dec 2025 10:14:48 +0000</lastBuildDate>
	<language>en-GB</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	

<image>
	<url>https://wtlgroup.co.uk/wp-content/uploads/2025/11/elementor/thumbs/wtl-logo-black.svg</url>
	<title>Fencing Archives - WTL Group</title>
	<link>https://wtlgroup.co.uk/division/fencing/</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>Strength in a Crisis – Corby Works</title>
		<link>https://wtlgroup.co.uk/projects/strength-in-a-crisis-corby-works/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Wed, 03 Dec 2025 11:34:43 +0000</pubDate>
				<guid isPermaLink="false">https://wtl2.thelogomark.co.uk/?post_type=projects&#038;p=1213</guid>

					<description><![CDATA[<p>Strength in a Crisis – Corby Works Severe weather conditions recently made national news when a large slope failure at Corby blocked both the north and southbound railway lines. At around 4pm, a northbound train ran directly into the landslip and was brought to a halt. As the ground continued to slip away, it became [&#8230;]</p>
<p>The post <a href="https://wtlgroup.co.uk/projects/strength-in-a-crisis-corby-works/">Strength in a Crisis – Corby Works</a> appeared first on <a href="https://wtlgroup.co.uk">WTL Group</a>.</p>
]]></description>
										<content:encoded><![CDATA[<h1>Strength in a Crisis<br />
–<br />
Corby Works</h1>
<p>Severe weather conditions recently made national news when a large slope failure at Corby blocked both the north and southbound railway lines.</p>
<p>At around 4pm, a northbound train ran directly into the landslip and was brought to a halt. As the ground continued to slip away, it became clear that the train could not be moved safely. The situation was further complicated by deep flooding along the tracks, preventing all services from passing through.</p>
<p>				<svg xmlns="http://www.w3.org/2000/svg" id="uuid-bd946c5e-4d4e-4424-bf11-6a3c319ca351" width="346.37" height="216.57" viewBox="0 0 346.37 216.57"><polygon points="196.34 170.02 196.34 196.34 20.23 196.34 20.23 20.23 196.34 20.23 196.34 46.55 216.57 46.55 216.57 0 0 0 0 216.57 216.57 216.57 216.57 170.02 196.34 170.02"></polygon><polygon points="291.06 130.37 291.06 86.57 291.06 86.57 291.06 67.43 291.06 67.43 291.06 67.43 267.11 67.43 267.11 67.43 187.74 67.43 187.74 67.43 163.67 67.43 163.67 67.43 163.67 67.43 163.61 67.63 145.71 123.91 126.1 67.43 104.02 67.43 84.42 123.91 66.45 67.43 41.91 67.43 71.97 149.62 95.57 149.62 114.83 92.44 133.97 149.62 157.8 149.62 180.77 86.57 211.67 86.57 211.67 149.62 235.62 149.62 235.62 86.57 267.11 86.57 267.11 149.62 346.37 149.62 346.37 130.37 291.06 130.37"></polygon></svg>				</p>
<h4>
							Our Response<br />
					</h4>
<p>WTL were called in at short notice to deliver an emergency solution that would stabilise the ground and allow works to continue safely. Our team quickly constructed shuttering using concrete pans around the top of the affected ground piles.</p>
<p>To reinforce the structure, we built a network of steel rebar, tied and set in place, before filling the shuttering with poured concrete. Once hardened, spoil was carefully graded against the new retaining structure to provide added strength and support.</p>
<p>				<svg xmlns="http://www.w3.org/2000/svg" id="uuid-bd946c5e-4d4e-4424-bf11-6a3c319ca351" width="346.37" height="216.57" viewBox="0 0 346.37 216.57"><polygon points="196.34 170.02 196.34 196.34 20.23 196.34 20.23 20.23 196.34 20.23 196.34 46.55 216.57 46.55 216.57 0 0 0 0 216.57 216.57 216.57 216.57 170.02 196.34 170.02"></polygon><polygon points="291.06 130.37 291.06 86.57 291.06 86.57 291.06 67.43 291.06 67.43 291.06 67.43 267.11 67.43 267.11 67.43 187.74 67.43 187.74 67.43 163.67 67.43 163.67 67.43 163.67 67.43 163.61 67.63 145.71 123.91 126.1 67.43 104.02 67.43 84.42 123.91 66.45 67.43 41.91 67.43 71.97 149.62 95.57 149.62 114.83 92.44 133.97 149.62 157.8 149.62 180.77 86.57 211.67 86.57 211.67 149.62 235.62 149.62 235.62 86.57 267.11 86.57 267.11 149.62 346.37 149.62 346.37 130.37 291.06 130.37"></polygon></svg>				</p>
<h4>
							Finishing Works<br />
					</h4>
<p>After completing the structural repairs, we reinstated the boundary security by replacing the palisade fencing. This ensured that the site was left safe, secure, and ready for ongoing rail operations.</p>
<p>The emergency works were delivered efficiently under challenging conditions, with safety at the forefront of every stage</p>
<p>				<svg xmlns="http://www.w3.org/2000/svg" id="uuid-bd946c5e-4d4e-4424-bf11-6a3c319ca351" width="346.37" height="216.57" viewBox="0 0 346.37 216.57"><polygon points="196.34 170.02 196.34 196.34 20.23 196.34 20.23 20.23 196.34 20.23 196.34 46.55 216.57 46.55 216.57 0 0 0 0 216.57 216.57 216.57 216.57 170.02 196.34 170.02"></polygon><polygon points="291.06 130.37 291.06 86.57 291.06 86.57 291.06 67.43 291.06 67.43 291.06 67.43 267.11 67.43 267.11 67.43 187.74 67.43 187.74 67.43 163.67 67.43 163.67 67.43 163.67 67.43 163.61 67.63 145.71 123.91 126.1 67.43 104.02 67.43 84.42 123.91 66.45 67.43 41.91 67.43 71.97 149.62 95.57 149.62 114.83 92.44 133.97 149.62 157.8 149.62 180.77 86.57 211.67 86.57 211.67 149.62 235.62 149.62 235.62 86.57 267.11 86.57 267.11 149.62 346.37 149.62 346.37 130.37 291.06 130.37"></polygon></svg>				</p>
<h4>
							Outcome<br />
					</h4>
<p>The finished slab was delivered on schedule, providing a strong and stable base for the new Coal Yard buildings. Despite the challenges of contaminated spoil removal and unexpected ground conditions, the project was completed within the original two-week timeframe.</p>
<p>The post <a href="https://wtlgroup.co.uk/projects/strength-in-a-crisis-corby-works/">Strength in a Crisis – Corby Works</a> appeared first on <a href="https://wtlgroup.co.uk">WTL Group</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Heritage Fencing for Leeds Station</title>
		<link>https://wtlgroup.co.uk/projects/heritage-fencing-for-leeds-station/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Wed, 03 Dec 2025 11:12:47 +0000</pubDate>
				<guid isPermaLink="false">https://wtl2.thelogomark.co.uk/?post_type=projects&#038;p=1185</guid>

					<description><![CDATA[<p>Heritage Fencing for Leeds Station WTL were appointed by Buckingham Group Ltd to carry out perimeter works at Leeds Station’s Princess Car Park. The project involved replicating and replacing fencing that had been in place for over half a century, while also delivering new access, handrail, and safety features for the remodelled station. Bespoke Steel [&#8230;]</p>
<p>The post <a href="https://wtlgroup.co.uk/projects/heritage-fencing-for-leeds-station/">Heritage Fencing for Leeds Station</a> appeared first on <a href="https://wtlgroup.co.uk">WTL Group</a>.</p>
]]></description>
										<content:encoded><![CDATA[<h1>Heritage Fencing for Leeds Station</h1>
<p>WTL were appointed by Buckingham Group Ltd to carry out perimeter works at Leeds Station’s Princess Car Park. The project involved replicating and replacing fencing that had been in place for over half a century, while also delivering new access, handrail, and safety features for the remodelled station.</p>
<p>				<svg xmlns="http://www.w3.org/2000/svg" id="uuid-bd946c5e-4d4e-4424-bf11-6a3c319ca351" width="346.37" height="216.57" viewBox="0 0 346.37 216.57"><polygon points="196.34 170.02 196.34 196.34 20.23 196.34 20.23 20.23 196.34 20.23 196.34 46.55 216.57 46.55 216.57 0 0 0 0 216.57 216.57 216.57 216.57 170.02 196.34 170.02"></polygon><polygon points="291.06 130.37 291.06 86.57 291.06 86.57 291.06 67.43 291.06 67.43 291.06 67.43 267.11 67.43 267.11 67.43 187.74 67.43 187.74 67.43 163.67 67.43 163.67 67.43 163.67 67.43 163.61 67.63 145.71 123.91 126.1 67.43 104.02 67.43 84.42 123.91 66.45 67.43 41.91 67.43 71.97 149.62 95.57 149.62 114.83 92.44 133.97 149.62 157.8 149.62 180.77 86.57 211.67 86.57 211.67 149.62 235.62 149.62 235.62 86.57 267.11 86.57 267.11 149.62 346.37 149.62 346.37 130.37 291.06 130.37"></polygon></svg>				</p>
<h4>
							Bespoke Steel Fencing<br />
					</h4>
<p>The main challenge was to replicate the original steel fencing to maintain the character of the station. Working with a local fabricator, we measured, designed, and produced 16 new panels and matching posts. Each panel was built from mild steel, welded to exact dimensions, powder-coated in gloss black, and weighed around 160kg. Posts added a further 20kg each. Within a week, a template was approved, and fabrication began.</p>
<p>Installation took around a week and a half. Where possible, we re-used existing panels to preserve the authentic look, blending old and new seamlessly.</p>
<p>				<svg xmlns="http://www.w3.org/2000/svg" id="uuid-bd946c5e-4d4e-4424-bf11-6a3c319ca351" width="346.37" height="216.57" viewBox="0 0 346.37 216.57"><polygon points="196.34 170.02 196.34 196.34 20.23 196.34 20.23 20.23 196.34 20.23 196.34 46.55 216.57 46.55 216.57 0 0 0 0 216.57 216.57 216.57 216.57 170.02 196.34 170.02"></polygon><polygon points="291.06 130.37 291.06 86.57 291.06 86.57 291.06 67.43 291.06 67.43 291.06 67.43 267.11 67.43 267.11 67.43 187.74 67.43 187.74 67.43 163.67 67.43 163.67 67.43 163.67 67.43 163.61 67.63 145.71 123.91 126.1 67.43 104.02 67.43 84.42 123.91 66.45 67.43 41.91 67.43 71.97 149.62 95.57 149.62 114.83 92.44 133.97 149.62 157.8 149.62 180.77 86.57 211.67 86.57 211.67 149.62 235.62 149.62 235.62 86.57 267.11 86.57 267.11 149.62 346.37 149.62 346.37 130.37 291.06 130.37"></polygon></svg>				</p>
<h4>
							Additional Works<br />
					</h4>
<ul>
<li>
										Installed Paladin fencing around the line &#8211; side car park perimeter , finished in black with electronic pedestrian gates and a 4m vehicular gate
									</li>
<li>
										Fixed more than 175m of GRP handrail, resin &#8211; bolted to kerbs with all joints riveted for strength and safety
									</li>
<li>
										Completed the car park with galvanised Armco barriers to protect vehicles and pedestrians
									</li>
</ul>
<p>				<svg xmlns="http://www.w3.org/2000/svg" id="uuid-bd946c5e-4d4e-4424-bf11-6a3c319ca351" width="346.37" height="216.57" viewBox="0 0 346.37 216.57"><polygon points="196.34 170.02 196.34 196.34 20.23 196.34 20.23 20.23 196.34 20.23 196.34 46.55 216.57 46.55 216.57 0 0 0 0 216.57 216.57 216.57 216.57 170.02 196.34 170.02"></polygon><polygon points="291.06 130.37 291.06 86.57 291.06 86.57 291.06 67.43 291.06 67.43 291.06 67.43 267.11 67.43 267.11 67.43 187.74 67.43 187.74 67.43 163.67 67.43 163.67 67.43 163.67 67.43 163.61 67.63 145.71 123.91 126.1 67.43 104.02 67.43 84.42 123.91 66.45 67.43 41.91 67.43 71.97 149.62 95.57 149.62 114.83 92.44 133.97 149.62 157.8 149.62 180.77 86.57 211.67 86.57 211.67 149.62 235.62 149.62 235.62 86.57 267.11 86.57 267.11 149.62 346.37 149.62 346.37 130.37 291.06 130.37"></polygon></svg>				</p>
<h4>
							Outcome<br />
					</h4>
<p>The project was completed to a high standard, retaining the station’s heritage feel while delivering durable, modern safety measures.</p>
<p>The post <a href="https://wtlgroup.co.uk/projects/heritage-fencing-for-leeds-station/">Heritage Fencing for Leeds Station</a> appeared first on <a href="https://wtlgroup.co.uk">WTL Group</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Bridge Security Works at Long Eaton</title>
		<link>https://wtlgroup.co.uk/projects/bridge-security-works-at-long-eaton/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Wed, 03 Dec 2025 11:10:23 +0000</pubDate>
				<guid isPermaLink="false">https://wtl2.thelogomark.co.uk/?post_type=projects&#038;p=1177</guid>

					<description><![CDATA[<p>Bridge Security Works at Long Eaton WTL partnered with Construction Marine Ltd to install new galvanised palisade fencing beneath a railway bridge at Long Eaton. The goal was to secure the area while protecting the integrity of the bridge structure. Project Scope The works were scheduled to be completed within one week. Using our on-site [&#8230;]</p>
<p>The post <a href="https://wtlgroup.co.uk/projects/bridge-security-works-at-long-eaton/">Bridge Security Works at Long Eaton</a> appeared first on <a href="https://wtlgroup.co.uk">WTL Group</a>.</p>
]]></description>
										<content:encoded><![CDATA[<h1>Bridge Security Works at Long Eaton</h1>
<p>WTL partnered with Construction Marine Ltd to install new galvanised palisade fencing beneath a railway bridge at Long Eaton. The goal was to secure the area while protecting the integrity of the bridge structure.</p>
<p>							<a href="https://wtlgroup.co.uk/wp-content/uploads/2025/12/WTL-Group-1.jpg" data-elementor-open-lightbox="yes" data-elementor-lightbox-slideshow="016408f" data-elementor-lightbox-title="WTL Group 1" data-e-action-hash="#elementor-action%3Aaction%3Dlightbox%26settings%3DeyJpZCI6MTUwMiwidXJsIjoiaHR0cHM6XC9cL3d0bDIudGhlbG9nb21hcmsuY28udWtcL3dwLWNvbnRlbnRcL3VwbG9hZHNcLzIwMjVcLzEyXC9XVEwtR3JvdXAtMS5qcGciLCJzbGlkZXNob3ciOiIwMTY0MDhmIn0%3D"><br />
														</a><br />
							<a href="https://wtlgroup.co.uk/wp-content/uploads/2025/12/wtl-group-crossgate.jpg" data-elementor-open-lightbox="yes" data-elementor-lightbox-slideshow="016408f" data-elementor-lightbox-title="wtl group crossgate" data-e-action-hash="#elementor-action%3Aaction%3Dlightbox%26settings%3DeyJpZCI6MTUzMSwidXJsIjoiaHR0cHM6XC9cL3d0bDIudGhlbG9nb21hcmsuY28udWtcL3dwLWNvbnRlbnRcL3VwbG9hZHNcLzIwMjVcLzEyXC93dGwtZ3JvdXAtY3Jvc3NnYXRlLmpwZyIsInNsaWRlc2hvdyI6IjAxNjQwOGYifQ%3D%3D"><br />
														</a><br />
							<a href="https://wtlgroup.co.uk/wp-content/uploads/2025/12/WTL-Group-2.jpg" data-elementor-open-lightbox="yes" data-elementor-lightbox-slideshow="016408f" data-elementor-lightbox-title="WTL Group 2" data-e-action-hash="#elementor-action%3Aaction%3Dlightbox%26settings%3DeyJpZCI6MTUwMSwidXJsIjoiaHR0cHM6XC9cL3d0bDIudGhlbG9nb21hcmsuY28udWtcL3dwLWNvbnRlbnRcL3VwbG9hZHNcLzIwMjVcLzEyXC9XVEwtR3JvdXAtMi5qcGciLCJzbGlkZXNob3ciOiIwMTY0MDhmIn0%3D"><br />
														</a><br />
							<a href="https://wtlgroup.co.uk/wp-content/uploads/2025/12/WTL-Group-3.jpg" data-elementor-open-lightbox="yes" data-elementor-lightbox-slideshow="016408f" data-elementor-lightbox-title="WTL Group 3" data-e-action-hash="#elementor-action%3Aaction%3Dlightbox%26settings%3DeyJpZCI6MTUwMCwidXJsIjoiaHR0cHM6XC9cL3d0bDIudGhlbG9nb21hcmsuY28udWtcL3dwLWNvbnRlbnRcL3VwbG9hZHNcLzIwMjVcLzEyXC9XVEwtR3JvdXAtMy5qcGciLCJzbGlkZXNob3ciOiIwMTY0MDhmIn0%3D"><br />
														</a></p>
<h4>
							Project Scope<br />
					</h4>
<p>The works were scheduled to be completed within one week. Using our on-site welders, we built the palisade fencing in-situ, carefully shaping it to follow the curved head of the bridge and adjoining sides</p>
<h4>
							Construction Process<br />
					</h4>
<p>To avoid placing stress on the bridge walls, the fencing was designed as a free-standing structure. Posts were chemically anchored into a concrete base that had been poured prior to our arrival, ensuring stability and strength. Once in place, the fencing provided a secure barrier while maintaining the bridge’s structural integrity.</p>
<h4>
							Outcome<br />
					</h4>
<p>The works were delivered efficiently and to a high standard. The new palisade fencing achieved complete security for the area beneath the bridge, with a durable resin floor-bolted framework that ensures long-term performance.</p>
<p>The post <a href="https://wtlgroup.co.uk/projects/bridge-security-works-at-long-eaton/">Bridge Security Works at Long Eaton</a> appeared first on <a href="https://wtlgroup.co.uk">WTL Group</a>.</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
