<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Geo-Tech Archives - WTL Group</title>
	<atom:link href="https://wtlgroup.co.uk/division/geo-tech/feed/" rel="self" type="application/rss+xml" />
	<link>https://wtlgroup.co.uk/division/geo-tech/</link>
	<description>Building Beyond Boundaries</description>
	<lastBuildDate>Mon, 26 Jan 2026 08:35:24 +0000</lastBuildDate>
	<language>en-GB</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	

<image>
	<url>https://wtlgroup.co.uk/wp-content/uploads/2025/11/elementor/thumbs/wtl-logo-black.svg</url>
	<title>Geo-Tech Archives - WTL Group</title>
	<link>https://wtlgroup.co.uk/division/geo-tech/</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>Great Brington Bridge Strengthening</title>
		<link>https://wtlgroup.co.uk/projects/great-brington-bridge-strengthening/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Mon, 26 Jan 2026 08:22:35 +0000</pubDate>
				<guid isPermaLink="false">https://wtl2.thelogomark.co.uk/?post_type=projects&#038;p=2047</guid>

					<description><![CDATA[<p>The post <a href="https://wtlgroup.co.uk/projects/great-brington-bridge-strengthening/">Great Brington Bridge Strengthening</a> appeared first on <a href="https://wtlgroup.co.uk">WTL Group</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>The post <a href="https://wtlgroup.co.uk/projects/great-brington-bridge-strengthening/">Great Brington Bridge Strengthening</a> appeared first on <a href="https://wtlgroup.co.uk">WTL Group</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Strawberry Hill Embankment Stabilisation</title>
		<link>https://wtlgroup.co.uk/projects/strawberry-hill-embankment-stabilisation/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Mon, 26 Jan 2026 08:09:28 +0000</pubDate>
				<guid isPermaLink="false">https://wtl2.thelogomark.co.uk/?post_type=projects&#038;p=2043</guid>

					<description><![CDATA[<p>The post <a href="https://wtlgroup.co.uk/projects/strawberry-hill-embankment-stabilisation/">Strawberry Hill Embankment Stabilisation</a> appeared first on <a href="https://wtlgroup.co.uk">WTL Group</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>The post <a href="https://wtlgroup.co.uk/projects/strawberry-hill-embankment-stabilisation/">Strawberry Hill Embankment Stabilisation</a> appeared first on <a href="https://wtlgroup.co.uk">WTL Group</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Protecting the Line at Victory Pewsey</title>
		<link>https://wtlgroup.co.uk/projects/protecting-the-line-at-victory-pewsey/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Fri, 05 Dec 2025 09:53:20 +0000</pubDate>
				<guid isPermaLink="false">https://wtl2.thelogomark.co.uk/?post_type=projects&#038;p=1743</guid>

					<description><![CDATA[<p>The post <a href="https://wtlgroup.co.uk/projects/protecting-the-line-at-victory-pewsey/">Protecting the Line at Victory Pewsey</a> appeared first on <a href="https://wtlgroup.co.uk">WTL Group</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>The post <a href="https://wtlgroup.co.uk/projects/protecting-the-line-at-victory-pewsey/">Protecting the Line at Victory Pewsey</a> appeared first on <a href="https://wtlgroup.co.uk">WTL Group</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Rock Netting Works at Salterhebble Halifax</title>
		<link>https://wtlgroup.co.uk/projects/rock-netting-works-at-salterhebble-halifax/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Wed, 03 Dec 2025 11:29:48 +0000</pubDate>
				<guid isPermaLink="false">https://wtl2.thelogomark.co.uk/?post_type=projects&#038;p=1200</guid>

					<description><![CDATA[<p>Rock Netting Works at Salterhebble Halifax WTL were engaged to deliver vegetation clearance and rock netting works at Salterhebble, Halifax. The project was planned for mid-week and Saturday night possessions only, with no daytime access. Vegetation Management The first phase focused on clearing around 5,000m² of vegetation and carrying out 4,500m² of light scaling. All [&#8230;]</p>
<p>The post <a href="https://wtlgroup.co.uk/projects/rock-netting-works-at-salterhebble-halifax/">Rock Netting Works at Salterhebble Halifax</a> appeared first on <a href="https://wtlgroup.co.uk">WTL Group</a>.</p>
]]></description>
										<content:encoded><![CDATA[<h1>Rock Netting Works at Salterhebble Halifax</h1>
<p>WTL were engaged to deliver vegetation clearance and rock netting works at Salterhebble, Halifax. The project was planned for mid-week and Saturday night possessions only, with no daytime access.</p>
<p>				<svg xmlns="http://www.w3.org/2000/svg" id="uuid-bd946c5e-4d4e-4424-bf11-6a3c319ca351" width="346.37" height="216.57" viewBox="0 0 346.37 216.57"><polygon points="196.34 170.02 196.34 196.34 20.23 196.34 20.23 20.23 196.34 20.23 196.34 46.55 216.57 46.55 216.57 0 0 0 0 216.57 216.57 216.57 216.57 170.02 196.34 170.02"></polygon><polygon points="291.06 130.37 291.06 86.57 291.06 86.57 291.06 67.43 291.06 67.43 291.06 67.43 267.11 67.43 267.11 67.43 187.74 67.43 187.74 67.43 163.67 67.43 163.67 67.43 163.67 67.43 163.61 67.63 145.71 123.91 126.1 67.43 104.02 67.43 84.42 123.91 66.45 67.43 41.91 67.43 71.97 149.62 95.57 149.62 114.83 92.44 133.97 149.62 157.8 149.62 180.77 86.57 211.67 86.57 211.67 149.62 235.62 149.62 235.62 86.57 267.11 86.57 267.11 149.62 346.37 149.62 346.37 130.37 291.06 130.37"></polygon></svg>				</p>
<h4>
							Vegetation Management<br />
					</h4>
<p>The first phase focused on clearing around 5,000m² of vegetation and carrying out 4,500m² of light scaling. All stumps were reduced to 75mm, with waste fully removed from site to leave a clear working area.</p>
<p>				<svg xmlns="http://www.w3.org/2000/svg" id="uuid-bd946c5e-4d4e-4424-bf11-6a3c319ca351" width="346.37" height="216.57" viewBox="0 0 346.37 216.57"><polygon points="196.34 170.02 196.34 196.34 20.23 196.34 20.23 20.23 196.34 20.23 196.34 46.55 216.57 46.55 216.57 0 0 0 0 216.57 216.57 216.57 216.57 170.02 196.34 170.02"></polygon><polygon points="291.06 130.37 291.06 86.57 291.06 86.57 291.06 67.43 291.06 67.43 291.06 67.43 267.11 67.43 267.11 67.43 187.74 67.43 187.74 67.43 163.67 67.43 163.67 67.43 163.67 67.43 163.61 67.63 145.71 123.91 126.1 67.43 104.02 67.43 84.42 123.91 66.45 67.43 41.91 67.43 71.97 149.62 95.57 149.62 114.83 92.44 133.97 149.62 157.8 149.62 180.77 86.57 211.67 86.57 211.67 149.62 235.62 149.62 235.62 86.57 267.11 86.57 267.11 149.62 346.37 149.62 346.37 130.37 291.06 130.37"></polygon></svg>				</p>
<h4>
							Rock Drilling and Netting<br />
					</h4>
<p>Once the area was prepared, attention turned to rock face stabilisation. Our IRATA-trained rope access team worked with pneumatic tools and Marini drill rigs to bore holes up to 4m deep. Resin capsules were inserted and anchor bars spun in place, locking tight once the resin activated. A total of 170 anchors were installed across both the north and south portals.</p>
<p>Over 1,750m² of rock netting was then fixed in position. Each drop was stitched and clipped using air-powered clipping guns with stainless steel clips, while the top and bottom folds were tensioned with 16mm galvanised wire rope secured with bulldog grips. Exposed metal was coated with galvanised spray for added protection.</p>
<p>				<svg xmlns="http://www.w3.org/2000/svg" id="uuid-bd946c5e-4d4e-4424-bf11-6a3c319ca351" width="346.37" height="216.57" viewBox="0 0 346.37 216.57"><polygon points="196.34 170.02 196.34 196.34 20.23 196.34 20.23 20.23 196.34 20.23 196.34 46.55 216.57 46.55 216.57 0 0 0 0 216.57 216.57 216.57 216.57 170.02 196.34 170.02"></polygon><polygon points="291.06 130.37 291.06 86.57 291.06 86.57 291.06 67.43 291.06 67.43 291.06 67.43 267.11 67.43 267.11 67.43 187.74 67.43 187.74 67.43 163.67 67.43 163.67 67.43 163.67 67.43 163.61 67.63 145.71 123.91 126.1 67.43 104.02 67.43 84.42 123.91 66.45 67.43 41.91 67.43 71.97 149.62 95.57 149.62 114.83 92.44 133.97 149.62 157.8 149.62 180.77 86.57 211.67 86.57 211.67 149.62 235.62 149.62 235.62 86.57 267.11 86.57 267.11 149.62 346.37 149.62 346.37 130.37 291.06 130.37"></polygon></svg>				</p>
<h4>
							Outcome<br />
					</h4>
<p>Despite very short mid-week possessions of only two hours, and slightly longer Saturday shifts, the works were delivered on time and to a high standard. The completed netting provides long-term stability and safety for the railway.</p>
<p>The post <a href="https://wtlgroup.co.uk/projects/rock-netting-works-at-salterhebble-halifax/">Rock Netting Works at Salterhebble Halifax</a> appeared first on <a href="https://wtlgroup.co.uk">WTL Group</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Protecting Slopes at Normanton</title>
		<link>https://wtlgroup.co.uk/projects/protecting-slopes-at-normanton/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Wed, 03 Dec 2025 11:19:09 +0000</pubDate>
				<guid isPermaLink="false">https://wtl2.thelogomark.co.uk/?post_type=projects&#038;p=1195</guid>

					<description><![CDATA[<p>Protecting Slopes at Normanton WTL returned to Normanton near Wakefield following earlier vegetation clearance works completedin 2019. After the embankment had been regraded and hydro-seeded by a specialist contractor, wewere tasked with installing anerosion control blanket to stabilise the slope. Our Approach Using 300mm wooden pins supplied by the manufacturer, we rolled out the erosion [&#8230;]</p>
<p>The post <a href="https://wtlgroup.co.uk/projects/protecting-slopes-at-normanton/">Protecting Slopes at Normanton</a> appeared first on <a href="https://wtlgroup.co.uk">WTL Group</a>.</p>
]]></description>
										<content:encoded><![CDATA[<h1>Protecting Slopes at Normanton</h1>
<p>WTL returned to Normanton near Wakefield following earlier vegetation clearance works completedin 2019. After the embankment had been regraded and hydro-seeded by a specialist contractor, wewere tasked with installing anerosion control blanket to stabilise the slope.</p>
<p>				<svg xmlns="http://www.w3.org/2000/svg" id="uuid-bd946c5e-4d4e-4424-bf11-6a3c319ca351" width="346.37" height="216.57" viewBox="0 0 346.37 216.57"><polygon points="196.34 170.02 196.34 196.34 20.23 196.34 20.23 20.23 196.34 20.23 196.34 46.55 216.57 46.55 216.57 0 0 0 0 216.57 216.57 216.57 216.57 170.02 196.34 170.02"></polygon><polygon points="291.06 130.37 291.06 86.57 291.06 86.57 291.06 67.43 291.06 67.43 291.06 67.43 267.11 67.43 267.11 67.43 187.74 67.43 187.74 67.43 163.67 67.43 163.67 67.43 163.67 67.43 163.61 67.63 145.71 123.91 126.1 67.43 104.02 67.43 84.42 123.91 66.45 67.43 41.91 67.43 71.97 149.62 95.57 149.62 114.83 92.44 133.97 149.62 157.8 149.62 180.77 86.57 211.67 86.57 211.67 149.62 235.62 149.62 235.62 86.57 267.11 86.57 267.11 149.62 346.37 149.62 346.37 130.37 291.06 130.37"></polygon></svg>				</p>
<h4>
							Our Approach<br />
					</h4>
<p>Using 300mm wooden pins supplied by the manufacturer, we rolled out the erosion control blanket with a 75mm overlap to ensure full coverage. At the crest of the embankment, our team excavated a150mm x 150mm anchor trench with a 1.5t JCB. This trench secured the blanket firmly at the top edge, preventing slippage and ensuring long-term performance</p>
<p>				<svg xmlns="http://www.w3.org/2000/svg" id="uuid-bd946c5e-4d4e-4424-bf11-6a3c319ca351" width="346.37" height="216.57" viewBox="0 0 346.37 216.57"><polygon points="196.34 170.02 196.34 196.34 20.23 196.34 20.23 20.23 196.34 20.23 196.34 46.55 216.57 46.55 216.57 0 0 0 0 216.57 216.57 216.57 216.57 170.02 196.34 170.02"></polygon><polygon points="291.06 130.37 291.06 86.57 291.06 86.57 291.06 67.43 291.06 67.43 291.06 67.43 267.11 67.43 267.11 67.43 187.74 67.43 187.74 67.43 163.67 67.43 163.67 67.43 163.67 67.43 163.61 67.63 145.71 123.91 126.1 67.43 104.02 67.43 84.42 123.91 66.45 67.43 41.91 67.43 71.97 149.62 95.57 149.62 114.83 92.44 133.97 149.62 157.8 149.62 180.77 86.57 211.67 86.57 211.67 149.62 235.62 149.62 235.62 86.57 267.11 86.57 267.11 149.62 346.37 149.62 346.37 130.37 291.06 130.37"></polygon></svg>				</p>
<h4>
							Safe Access and Installation<br />
					</h4>
<p>Our operatives hold IRATA Level 1, 2, and 3 rope access qualifications, enabling safe setup and movement across the steep slope. Working from ropes, the team rolled and pinned the blanket in place with precision. The combination of rope access skills with vegetation management training, including chainsaw and brush cutter use, highlights WTL’s ability to deliver complex works safely and efficiently</p>
<p>				<svg xmlns="http://www.w3.org/2000/svg" id="uuid-bd946c5e-4d4e-4424-bf11-6a3c319ca351" width="346.37" height="216.57" viewBox="0 0 346.37 216.57"><polygon points="196.34 170.02 196.34 196.34 20.23 196.34 20.23 20.23 196.34 20.23 196.34 46.55 216.57 46.55 216.57 0 0 0 0 216.57 216.57 216.57 216.57 170.02 196.34 170.02"></polygon><polygon points="291.06 130.37 291.06 86.57 291.06 86.57 291.06 67.43 291.06 67.43 291.06 67.43 267.11 67.43 267.11 67.43 187.74 67.43 187.74 67.43 163.67 67.43 163.67 67.43 163.67 67.43 163.61 67.63 145.71 123.91 126.1 67.43 104.02 67.43 84.42 123.91 66.45 67.43 41.91 67.43 71.97 149.62 95.57 149.62 114.83 92.44 133.97 149.62 157.8 149.62 180.77 86.57 211.67 86.57 211.67 149.62 235.62 149.62 235.62 86.57 267.11 86.57 267.11 149.62 346.37 149.62 346.37 130.37 291.06 130.37"></polygon></svg>				</p>
<h4>
							Outcome<br />
					</h4>
<p>The completed works provided a strong erosion control solution, protecting the regraded slope and supporting the client’s long-term maintenance strategy.</p>
<p>The post <a href="https://wtlgroup.co.uk/projects/protecting-slopes-at-normanton/">Protecting Slopes at Normanton</a> appeared first on <a href="https://wtlgroup.co.uk">WTL Group</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Holding the Ground at Crossgates</title>
		<link>https://wtlgroup.co.uk/projects/holding-the-ground-at-crossgates/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Wed, 03 Dec 2025 11:16:15 +0000</pubDate>
				<guid isPermaLink="false">https://wtl2.thelogomark.co.uk/?post_type=projects&#038;p=1190</guid>

					<description><![CDATA[<p>Holding the Ground at Crossgates WTL recently completed important works at Crossgates Station in Leeds. The project combined two key tasks: clearing heavy vegetation from the platform side cutting and installing rock fall netting to secure the retaining walls on the opposite side of the bridge. Vegetation Clearance and Drilling Our team began by removing [&#8230;]</p>
<p>The post <a href="https://wtlgroup.co.uk/projects/holding-the-ground-at-crossgates/">Holding the Ground at Crossgates</a> appeared first on <a href="https://wtlgroup.co.uk">WTL Group</a>.</p>
]]></description>
										<content:encoded><![CDATA[<h1>Holding the Ground at Crossgates</h1>
<p>WTL recently completed important works at Crossgates Station in Leeds. The project combined two key tasks: clearing heavy vegetation from the platform side cutting and installing rock fall netting to secure the retaining walls on the opposite side of the bridge.</p>
<p>				<svg xmlns="http://www.w3.org/2000/svg" id="uuid-bd946c5e-4d4e-4424-bf11-6a3c319ca351" width="346.37" height="216.57" viewBox="0 0 346.37 216.57"><polygon points="196.34 170.02 196.34 196.34 20.23 196.34 20.23 20.23 196.34 20.23 196.34 46.55 216.57 46.55 216.57 0 0 0 0 216.57 216.57 216.57 216.57 170.02 196.34 170.02"></polygon><polygon points="291.06 130.37 291.06 86.57 291.06 86.57 291.06 67.43 291.06 67.43 291.06 67.43 267.11 67.43 267.11 67.43 187.74 67.43 187.74 67.43 163.67 67.43 163.67 67.43 163.67 67.43 163.61 67.63 145.71 123.91 126.1 67.43 104.02 67.43 84.42 123.91 66.45 67.43 41.91 67.43 71.97 149.62 95.57 149.62 114.83 92.44 133.97 149.62 157.8 149.62 180.77 86.57 211.67 86.57 211.67 149.62 235.62 149.62 235.62 86.57 267.11 86.57 267.11 149.62 346.37 149.62 346.37 130.37 291.06 130.37"></polygon></svg>				</p>
<h4>
							Vegetation Clearance and Drilling<br />
					</h4>
<p>Our team began by removing substantial vegetation that was obstructing the platform cutting. Once cleared, we moved to drilling works on the retaining walls. Using a Marini drill rig mounted on a Road Rail Vehicle (RRV) during Saturday night possessions, alongside hand-operated pneumatic drills, we installed dowels and anchors to support the netting. Anchors were resin-bonded in place, before netting was lowered down the wall face and secured with top and bottom cables fixed with D-shackles.</p>
<p>				<svg xmlns="http://www.w3.org/2000/svg" id="uuid-bd946c5e-4d4e-4424-bf11-6a3c319ca351" width="346.37" height="216.57" viewBox="0 0 346.37 216.57"><polygon points="196.34 170.02 196.34 196.34 20.23 196.34 20.23 20.23 196.34 20.23 196.34 46.55 216.57 46.55 216.57 0 0 0 0 216.57 216.57 216.57 216.57 170.02 196.34 170.02"></polygon><polygon points="291.06 130.37 291.06 86.57 291.06 86.57 291.06 67.43 291.06 67.43 291.06 67.43 267.11 67.43 267.11 67.43 187.74 67.43 187.74 67.43 163.67 67.43 163.67 67.43 163.67 67.43 163.61 67.63 145.71 123.91 126.1 67.43 104.02 67.43 84.42 123.91 66.45 67.43 41.91 67.43 71.97 149.62 95.57 149.62 114.83 92.44 133.97 149.62 157.8 149.62 180.77 86.57 211.67 86.57 211.67 149.62 235.62 149.62 235.62 86.57 267.11 86.57 267.11 149.62 346.37 149.62 346.37 130.37 291.06 130.37"></polygon></svg>				</p>
<h4>
							Anchor Installation<br />
					</h4>
<p>During daytime shifts, compressed air drills were used to bore anchors to a depth of around two metres at the top of the retaining wall. Hollow threaded bars were then set in place and secured with a specialist grout mix, filling each void completely for maximum stability.</p>
<p>Our IRATA-trained rope access technicians created a safe working system by attaching to palisade posts at the top of the wall. This setup allowed operatives to work securely across the entire area, clipping on and off the safety line as required.</p>
<p>				<svg xmlns="http://www.w3.org/2000/svg" id="uuid-bd946c5e-4d4e-4424-bf11-6a3c319ca351" width="346.37" height="216.57" viewBox="0 0 346.37 216.57"><polygon points="196.34 170.02 196.34 196.34 20.23 196.34 20.23 20.23 196.34 20.23 196.34 46.55 216.57 46.55 216.57 0 0 0 0 216.57 216.57 216.57 216.57 170.02 196.34 170.02"></polygon><polygon points="291.06 130.37 291.06 86.57 291.06 86.57 291.06 67.43 291.06 67.43 291.06 67.43 267.11 67.43 267.11 67.43 187.74 67.43 187.74 67.43 163.67 67.43 163.67 67.43 163.67 67.43 163.61 67.63 145.71 123.91 126.1 67.43 104.02 67.43 84.42 123.91 66.45 67.43 41.91 67.43 71.97 149.62 95.57 149.62 114.83 92.44 133.97 149.62 157.8 149.62 180.77 86.57 211.67 86.57 211.67 149.62 235.62 149.62 235.62 86.57 267.11 86.57 267.11 149.62 346.37 149.62 346.37 130.37 291.06 130.37"></polygon></svg>				</p>
<h4>
							Final Fixings<br />
					</h4>
<p>Seventeen anchors were installed and grouted at the top of the retaining wall, with another seventeen set into the trackside bottom using the Marini rig. Bars were locked in position with resin capsules, which hardened within 90 seconds once activated by the turmag. With anchor points secure, the netting was tensioned and fastened to provide lasting protection against rock falls.</p>
<p>The post <a href="https://wtlgroup.co.uk/projects/holding-the-ground-at-crossgates/">Holding the Ground at Crossgates</a> appeared first on <a href="https://wtlgroup.co.uk">WTL Group</a>.</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
