Great Brington Bridge Strengthening
Strawberry Hill Embankment Stabilisation
Protecting the Line at Victory Pewsey
Strength in a Crisis – Corby Works

Strength in a Crisis – Corby Works Severe weather conditions recently made national news when a large slope failure at Corby blocked both the north and southbound railway lines. At around 4pm, a northbound train ran directly into the landslip and was brought to a halt. As the ground continued to slip away, it became […]
Safe Access Solutions at Wellingborough

Safe Access Solutions at Wellingborough WTL were appointed by Galliford Try to construct three new access stairways on the Midland Main Line at Wellingborough. The project began in April 2019 and was completed by June 2020. Project Scope The stairways were required to provide safe access to a new flyover bridge, allowing maintenance teams and […]
Rock Netting Works at Salterhebble Halifax

Rock Netting Works at Salterhebble Halifax WTL were engaged to deliver vegetation clearance and rock netting works at Salterhebble, Halifax. The project was planned for mid-week and Saturday night possessions only, with no daytime access. Vegetation Management The first phase focused on clearing around 5,000m² of vegetation and carrying out 4,500m² of light scaling. All […]
Protecting Slopes at Normanton

Protecting Slopes at Normanton WTL returned to Normanton near Wakefield following earlier vegetation clearance works completedin 2019. After the embankment had been regraded and hydro-seeded by a specialist contractor, wewere tasked with installing anerosion control blanket to stabilise the slope. Our Approach Using 300mm wooden pins supplied by the manufacturer, we rolled out the erosion […]
Holding the Ground at Crossgates

Holding the Ground at Crossgates WTL recently completed important works at Crossgates Station in Leeds. The project combined two key tasks: clearing heavy vegetation from the platform side cutting and installing rock fall netting to secure the retaining walls on the opposite side of the bridge. Vegetation Clearance and Drilling Our team began by removing […]
Heritage Fencing for Leeds Station

Heritage Fencing for Leeds Station WTL were appointed by Buckingham Group Ltd to carry out perimeter works at Leeds Station’s Princess Car Park. The project involved replicating and replacing fencing that had been in place for over half a century, while also delivering new access, handrail, and safety features for the remodelled station. Bespoke Steel […]
Bridge Security Works at Long Eaton

Bridge Security Works at Long Eaton WTL partnered with Construction Marine Ltd to install new galvanised palisade fencing beneath a railway bridge at Long Eaton. The goal was to secure the area while protecting the integrity of the bridge structure. Project Scope The works were scheduled to be completed within one week. Using our on-site […]