<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Projects Archive - WTL Group</title>
	<atom:link href="https://wtlgroup.co.uk/projects/feed/" rel="self" type="application/rss+xml" />
	<link>https://wtlgroup.co.uk/projects/</link>
	<description>Building Beyond Boundaries</description>
	<lastBuildDate>Mon, 26 Jan 2026 08:35:24 +0000</lastBuildDate>
	<language>en-GB</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	

<image>
	<url>https://wtlgroup.co.uk/wp-content/uploads/2025/11/elementor/thumbs/wtl-logo-black.svg</url>
	<title>Projects Archive - WTL Group</title>
	<link>https://wtlgroup.co.uk/projects/</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>Great Brington Bridge Strengthening</title>
		<link>https://wtlgroup.co.uk/projects/great-brington-bridge-strengthening/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Mon, 26 Jan 2026 08:22:35 +0000</pubDate>
				<guid isPermaLink="false">https://wtl2.thelogomark.co.uk/?post_type=projects&#038;p=2047</guid>

					<description><![CDATA[<p>The post <a href="https://wtlgroup.co.uk/projects/great-brington-bridge-strengthening/">Great Brington Bridge Strengthening</a> appeared first on <a href="https://wtlgroup.co.uk">WTL Group</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>The post <a href="https://wtlgroup.co.uk/projects/great-brington-bridge-strengthening/">Great Brington Bridge Strengthening</a> appeared first on <a href="https://wtlgroup.co.uk">WTL Group</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Strawberry Hill Embankment Stabilisation</title>
		<link>https://wtlgroup.co.uk/projects/strawberry-hill-embankment-stabilisation/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Mon, 26 Jan 2026 08:09:28 +0000</pubDate>
				<guid isPermaLink="false">https://wtl2.thelogomark.co.uk/?post_type=projects&#038;p=2043</guid>

					<description><![CDATA[<p>The post <a href="https://wtlgroup.co.uk/projects/strawberry-hill-embankment-stabilisation/">Strawberry Hill Embankment Stabilisation</a> appeared first on <a href="https://wtlgroup.co.uk">WTL Group</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>The post <a href="https://wtlgroup.co.uk/projects/strawberry-hill-embankment-stabilisation/">Strawberry Hill Embankment Stabilisation</a> appeared first on <a href="https://wtlgroup.co.uk">WTL Group</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Protecting the Line at Victory Pewsey</title>
		<link>https://wtlgroup.co.uk/projects/protecting-the-line-at-victory-pewsey/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Fri, 05 Dec 2025 09:53:20 +0000</pubDate>
				<guid isPermaLink="false">https://wtl2.thelogomark.co.uk/?post_type=projects&#038;p=1743</guid>

					<description><![CDATA[<p>The post <a href="https://wtlgroup.co.uk/projects/protecting-the-line-at-victory-pewsey/">Protecting the Line at Victory Pewsey</a> appeared first on <a href="https://wtlgroup.co.uk">WTL Group</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>The post <a href="https://wtlgroup.co.uk/projects/protecting-the-line-at-victory-pewsey/">Protecting the Line at Victory Pewsey</a> appeared first on <a href="https://wtlgroup.co.uk">WTL Group</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Strength in a Crisis – Corby Works</title>
		<link>https://wtlgroup.co.uk/projects/strength-in-a-crisis-corby-works/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Wed, 03 Dec 2025 11:34:43 +0000</pubDate>
				<guid isPermaLink="false">https://wtl2.thelogomark.co.uk/?post_type=projects&#038;p=1213</guid>

					<description><![CDATA[<p>Strength in a Crisis – Corby Works Severe weather conditions recently made national news when a large slope failure at Corby blocked both the north and southbound railway lines. At around 4pm, a northbound train ran directly into the landslip and was brought to a halt. As the ground continued to slip away, it became [&#8230;]</p>
<p>The post <a href="https://wtlgroup.co.uk/projects/strength-in-a-crisis-corby-works/">Strength in a Crisis – Corby Works</a> appeared first on <a href="https://wtlgroup.co.uk">WTL Group</a>.</p>
]]></description>
										<content:encoded><![CDATA[<h1>Strength in a Crisis<br />
–<br />
Corby Works</h1>
<p>Severe weather conditions recently made national news when a large slope failure at Corby blocked both the north and southbound railway lines.</p>
<p>At around 4pm, a northbound train ran directly into the landslip and was brought to a halt. As the ground continued to slip away, it became clear that the train could not be moved safely. The situation was further complicated by deep flooding along the tracks, preventing all services from passing through.</p>
<p>				<svg xmlns="http://www.w3.org/2000/svg" id="uuid-bd946c5e-4d4e-4424-bf11-6a3c319ca351" width="346.37" height="216.57" viewBox="0 0 346.37 216.57"><polygon points="196.34 170.02 196.34 196.34 20.23 196.34 20.23 20.23 196.34 20.23 196.34 46.55 216.57 46.55 216.57 0 0 0 0 216.57 216.57 216.57 216.57 170.02 196.34 170.02"></polygon><polygon points="291.06 130.37 291.06 86.57 291.06 86.57 291.06 67.43 291.06 67.43 291.06 67.43 267.11 67.43 267.11 67.43 187.74 67.43 187.74 67.43 163.67 67.43 163.67 67.43 163.67 67.43 163.61 67.63 145.71 123.91 126.1 67.43 104.02 67.43 84.42 123.91 66.45 67.43 41.91 67.43 71.97 149.62 95.57 149.62 114.83 92.44 133.97 149.62 157.8 149.62 180.77 86.57 211.67 86.57 211.67 149.62 235.62 149.62 235.62 86.57 267.11 86.57 267.11 149.62 346.37 149.62 346.37 130.37 291.06 130.37"></polygon></svg>				</p>
<h4>
							Our Response<br />
					</h4>
<p>WTL were called in at short notice to deliver an emergency solution that would stabilise the ground and allow works to continue safely. Our team quickly constructed shuttering using concrete pans around the top of the affected ground piles.</p>
<p>To reinforce the structure, we built a network of steel rebar, tied and set in place, before filling the shuttering with poured concrete. Once hardened, spoil was carefully graded against the new retaining structure to provide added strength and support.</p>
<p>				<svg xmlns="http://www.w3.org/2000/svg" id="uuid-bd946c5e-4d4e-4424-bf11-6a3c319ca351" width="346.37" height="216.57" viewBox="0 0 346.37 216.57"><polygon points="196.34 170.02 196.34 196.34 20.23 196.34 20.23 20.23 196.34 20.23 196.34 46.55 216.57 46.55 216.57 0 0 0 0 216.57 216.57 216.57 216.57 170.02 196.34 170.02"></polygon><polygon points="291.06 130.37 291.06 86.57 291.06 86.57 291.06 67.43 291.06 67.43 291.06 67.43 267.11 67.43 267.11 67.43 187.74 67.43 187.74 67.43 163.67 67.43 163.67 67.43 163.67 67.43 163.61 67.63 145.71 123.91 126.1 67.43 104.02 67.43 84.42 123.91 66.45 67.43 41.91 67.43 71.97 149.62 95.57 149.62 114.83 92.44 133.97 149.62 157.8 149.62 180.77 86.57 211.67 86.57 211.67 149.62 235.62 149.62 235.62 86.57 267.11 86.57 267.11 149.62 346.37 149.62 346.37 130.37 291.06 130.37"></polygon></svg>				</p>
<h4>
							Finishing Works<br />
					</h4>
<p>After completing the structural repairs, we reinstated the boundary security by replacing the palisade fencing. This ensured that the site was left safe, secure, and ready for ongoing rail operations.</p>
<p>The emergency works were delivered efficiently under challenging conditions, with safety at the forefront of every stage</p>
<p>				<svg xmlns="http://www.w3.org/2000/svg" id="uuid-bd946c5e-4d4e-4424-bf11-6a3c319ca351" width="346.37" height="216.57" viewBox="0 0 346.37 216.57"><polygon points="196.34 170.02 196.34 196.34 20.23 196.34 20.23 20.23 196.34 20.23 196.34 46.55 216.57 46.55 216.57 0 0 0 0 216.57 216.57 216.57 216.57 170.02 196.34 170.02"></polygon><polygon points="291.06 130.37 291.06 86.57 291.06 86.57 291.06 67.43 291.06 67.43 291.06 67.43 267.11 67.43 267.11 67.43 187.74 67.43 187.74 67.43 163.67 67.43 163.67 67.43 163.67 67.43 163.61 67.63 145.71 123.91 126.1 67.43 104.02 67.43 84.42 123.91 66.45 67.43 41.91 67.43 71.97 149.62 95.57 149.62 114.83 92.44 133.97 149.62 157.8 149.62 180.77 86.57 211.67 86.57 211.67 149.62 235.62 149.62 235.62 86.57 267.11 86.57 267.11 149.62 346.37 149.62 346.37 130.37 291.06 130.37"></polygon></svg>				</p>
<h4>
							Outcome<br />
					</h4>
<p>The finished slab was delivered on schedule, providing a strong and stable base for the new Coal Yard buildings. Despite the challenges of contaminated spoil removal and unexpected ground conditions, the project was completed within the original two-week timeframe.</p>
<p>The post <a href="https://wtlgroup.co.uk/projects/strength-in-a-crisis-corby-works/">Strength in a Crisis – Corby Works</a> appeared first on <a href="https://wtlgroup.co.uk">WTL Group</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Safe Access Solutions at Wellingborough</title>
		<link>https://wtlgroup.co.uk/projects/safe-access-solutions-at-wellingborough/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Wed, 03 Dec 2025 11:32:38 +0000</pubDate>
				<guid isPermaLink="false">https://wtl2.thelogomark.co.uk/?post_type=projects&#038;p=1207</guid>

					<description><![CDATA[<p>Safe Access Solutions at Wellingborough WTL were appointed by Galliford Try to construct three new access stairways on the Midland Main Line at Wellingborough. The project began in April 2019 and was completed by June 2020. Project Scope The stairways were required to provide safe access to a new flyover bridge, allowing maintenance teams and [&#8230;]</p>
<p>The post <a href="https://wtlgroup.co.uk/projects/safe-access-solutions-at-wellingborough/">Safe Access Solutions at Wellingborough</a> appeared first on <a href="https://wtlgroup.co.uk">WTL Group</a>.</p>
]]></description>
										<content:encoded><![CDATA[<h1>Safe Access Solutions at Wellingborough</h1>
<p>WTL were appointed by Galliford Try to construct three new access stairways on the Midland Main Line at Wellingborough. The project began in April 2019 and was completed by June 2020.</p>
<p>				<svg xmlns="http://www.w3.org/2000/svg" id="uuid-bd946c5e-4d4e-4424-bf11-6a3c319ca351" width="346.37" height="216.57" viewBox="0 0 346.37 216.57"><polygon points="196.34 170.02 196.34 196.34 20.23 196.34 20.23 20.23 196.34 20.23 196.34 46.55 216.57 46.55 216.57 0 0 0 0 216.57 216.57 216.57 216.57 170.02 196.34 170.02"></polygon><polygon points="291.06 130.37 291.06 86.57 291.06 86.57 291.06 67.43 291.06 67.43 291.06 67.43 267.11 67.43 267.11 67.43 187.74 67.43 187.74 67.43 163.67 67.43 163.67 67.43 163.67 67.43 163.61 67.63 145.71 123.91 126.1 67.43 104.02 67.43 84.42 123.91 66.45 67.43 41.91 67.43 71.97 149.62 95.57 149.62 114.83 92.44 133.97 149.62 157.8 149.62 180.77 86.57 211.67 86.57 211.67 149.62 235.62 149.62 235.62 86.57 267.11 86.57 267.11 149.62 346.37 149.62 346.37 130.37 291.06 130.37"></polygon></svg>				</p>
<h4>
							Project Scope<br />
					</h4>
<p>The stairways were required to provide safe access to a new flyover bridge, allowing maintenance teams and trackside operatives to move safely from the cess to the top of the embankment</p>
<p>				<svg xmlns="http://www.w3.org/2000/svg" id="uuid-bd946c5e-4d4e-4424-bf11-6a3c319ca351" width="346.37" height="216.57" viewBox="0 0 346.37 216.57"><polygon points="196.34 170.02 196.34 196.34 20.23 196.34 20.23 20.23 196.34 20.23 196.34 46.55 216.57 46.55 216.57 0 0 0 0 216.57 216.57 216.57 216.57 170.02 196.34 170.02"></polygon><polygon points="291.06 130.37 291.06 86.57 291.06 86.57 291.06 67.43 291.06 67.43 291.06 67.43 267.11 67.43 267.11 67.43 187.74 67.43 187.74 67.43 163.67 67.43 163.67 67.43 163.67 67.43 163.61 67.63 145.71 123.91 126.1 67.43 104.02 67.43 84.42 123.91 66.45 67.43 41.91 67.43 71.97 149.62 95.57 149.62 114.83 92.44 133.97 149.62 157.8 149.62 180.77 86.57 211.67 86.57 211.67 149.62 235.62 149.62 235.62 86.57 267.11 86.57 267.11 149.62 346.37 149.62 346.37 130.37 291.06 130.37"></polygon></svg>				</p>
<h4>
							Our Approach<br />
					</h4>
<p>The embankment was first graded using JCB excavators. Each stairway was then set out in sections, with concrete-poured landings used to maintain the correct elevation. The steps were constructed using engineering bricks laid on edge, finished with 500mm x 500mm concrete pavers for durability and stability.</p>
<p>				<svg xmlns="http://www.w3.org/2000/svg" id="uuid-bd946c5e-4d4e-4424-bf11-6a3c319ca351" width="346.37" height="216.57" viewBox="0 0 346.37 216.57"><polygon points="196.34 170.02 196.34 196.34 20.23 196.34 20.23 20.23 196.34 20.23 196.34 46.55 216.57 46.55 216.57 0 0 0 0 216.57 216.57 216.57 216.57 170.02 196.34 170.02"></polygon><polygon points="291.06 130.37 291.06 86.57 291.06 86.57 291.06 67.43 291.06 67.43 291.06 67.43 267.11 67.43 267.11 67.43 187.74 67.43 187.74 67.43 163.67 67.43 163.67 67.43 163.67 67.43 163.61 67.63 145.71 123.91 126.1 67.43 104.02 67.43 84.42 123.91 66.45 67.43 41.91 67.43 71.97 149.62 95.57 149.62 114.83 92.44 133.97 149.62 157.8 149.62 180.77 86.57 211.67 86.57 211.67 149.62 235.62 149.62 235.62 86.57 267.11 86.57 267.11 149.62 346.37 149.62 346.37 130.37 291.06 130.37"></polygon></svg>				</p>
<h4>
							Finishing Works<br />
					</h4>
<p>To complete the works, a preformed galvanised key clamp handrail system was installed from top to bottom of each stairway, providing a continuous and secure guide for operatives.</p>
<p>				<svg xmlns="http://www.w3.org/2000/svg" id="uuid-bd946c5e-4d4e-4424-bf11-6a3c319ca351" width="346.37" height="216.57" viewBox="0 0 346.37 216.57"><polygon points="196.34 170.02 196.34 196.34 20.23 196.34 20.23 20.23 196.34 20.23 196.34 46.55 216.57 46.55 216.57 0 0 0 0 216.57 216.57 216.57 216.57 170.02 196.34 170.02"></polygon><polygon points="291.06 130.37 291.06 86.57 291.06 86.57 291.06 67.43 291.06 67.43 291.06 67.43 267.11 67.43 267.11 67.43 187.74 67.43 187.74 67.43 163.67 67.43 163.67 67.43 163.67 67.43 163.61 67.63 145.71 123.91 126.1 67.43 104.02 67.43 84.42 123.91 66.45 67.43 41.91 67.43 71.97 149.62 95.57 149.62 114.83 92.44 133.97 149.62 157.8 149.62 180.77 86.57 211.67 86.57 211.67 149.62 235.62 149.62 235.62 86.57 267.11 86.57 267.11 149.62 346.37 149.62 346.37 130.37 291.06 130.37"></polygon></svg>				</p>
<h4>
							Outcome<br />
					</h4>
<p>The stairways were delivered to a high standard, offering long-term, safe, and practical access for railway staff working around the new bridge and embankment.</p>
<p>The post <a href="https://wtlgroup.co.uk/projects/safe-access-solutions-at-wellingborough/">Safe Access Solutions at Wellingborough</a> appeared first on <a href="https://wtlgroup.co.uk">WTL Group</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Rock Netting Works at Salterhebble Halifax</title>
		<link>https://wtlgroup.co.uk/projects/rock-netting-works-at-salterhebble-halifax/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Wed, 03 Dec 2025 11:29:48 +0000</pubDate>
				<guid isPermaLink="false">https://wtl2.thelogomark.co.uk/?post_type=projects&#038;p=1200</guid>

					<description><![CDATA[<p>Rock Netting Works at Salterhebble Halifax WTL were engaged to deliver vegetation clearance and rock netting works at Salterhebble, Halifax. The project was planned for mid-week and Saturday night possessions only, with no daytime access. Vegetation Management The first phase focused on clearing around 5,000m² of vegetation and carrying out 4,500m² of light scaling. All [&#8230;]</p>
<p>The post <a href="https://wtlgroup.co.uk/projects/rock-netting-works-at-salterhebble-halifax/">Rock Netting Works at Salterhebble Halifax</a> appeared first on <a href="https://wtlgroup.co.uk">WTL Group</a>.</p>
]]></description>
										<content:encoded><![CDATA[<h1>Rock Netting Works at Salterhebble Halifax</h1>
<p>WTL were engaged to deliver vegetation clearance and rock netting works at Salterhebble, Halifax. The project was planned for mid-week and Saturday night possessions only, with no daytime access.</p>
<p>				<svg xmlns="http://www.w3.org/2000/svg" id="uuid-bd946c5e-4d4e-4424-bf11-6a3c319ca351" width="346.37" height="216.57" viewBox="0 0 346.37 216.57"><polygon points="196.34 170.02 196.34 196.34 20.23 196.34 20.23 20.23 196.34 20.23 196.34 46.55 216.57 46.55 216.57 0 0 0 0 216.57 216.57 216.57 216.57 170.02 196.34 170.02"></polygon><polygon points="291.06 130.37 291.06 86.57 291.06 86.57 291.06 67.43 291.06 67.43 291.06 67.43 267.11 67.43 267.11 67.43 187.74 67.43 187.74 67.43 163.67 67.43 163.67 67.43 163.67 67.43 163.61 67.63 145.71 123.91 126.1 67.43 104.02 67.43 84.42 123.91 66.45 67.43 41.91 67.43 71.97 149.62 95.57 149.62 114.83 92.44 133.97 149.62 157.8 149.62 180.77 86.57 211.67 86.57 211.67 149.62 235.62 149.62 235.62 86.57 267.11 86.57 267.11 149.62 346.37 149.62 346.37 130.37 291.06 130.37"></polygon></svg>				</p>
<h4>
							Vegetation Management<br />
					</h4>
<p>The first phase focused on clearing around 5,000m² of vegetation and carrying out 4,500m² of light scaling. All stumps were reduced to 75mm, with waste fully removed from site to leave a clear working area.</p>
<p>				<svg xmlns="http://www.w3.org/2000/svg" id="uuid-bd946c5e-4d4e-4424-bf11-6a3c319ca351" width="346.37" height="216.57" viewBox="0 0 346.37 216.57"><polygon points="196.34 170.02 196.34 196.34 20.23 196.34 20.23 20.23 196.34 20.23 196.34 46.55 216.57 46.55 216.57 0 0 0 0 216.57 216.57 216.57 216.57 170.02 196.34 170.02"></polygon><polygon points="291.06 130.37 291.06 86.57 291.06 86.57 291.06 67.43 291.06 67.43 291.06 67.43 267.11 67.43 267.11 67.43 187.74 67.43 187.74 67.43 163.67 67.43 163.67 67.43 163.67 67.43 163.61 67.63 145.71 123.91 126.1 67.43 104.02 67.43 84.42 123.91 66.45 67.43 41.91 67.43 71.97 149.62 95.57 149.62 114.83 92.44 133.97 149.62 157.8 149.62 180.77 86.57 211.67 86.57 211.67 149.62 235.62 149.62 235.62 86.57 267.11 86.57 267.11 149.62 346.37 149.62 346.37 130.37 291.06 130.37"></polygon></svg>				</p>
<h4>
							Rock Drilling and Netting<br />
					</h4>
<p>Once the area was prepared, attention turned to rock face stabilisation. Our IRATA-trained rope access team worked with pneumatic tools and Marini drill rigs to bore holes up to 4m deep. Resin capsules were inserted and anchor bars spun in place, locking tight once the resin activated. A total of 170 anchors were installed across both the north and south portals.</p>
<p>Over 1,750m² of rock netting was then fixed in position. Each drop was stitched and clipped using air-powered clipping guns with stainless steel clips, while the top and bottom folds were tensioned with 16mm galvanised wire rope secured with bulldog grips. Exposed metal was coated with galvanised spray for added protection.</p>
<p>				<svg xmlns="http://www.w3.org/2000/svg" id="uuid-bd946c5e-4d4e-4424-bf11-6a3c319ca351" width="346.37" height="216.57" viewBox="0 0 346.37 216.57"><polygon points="196.34 170.02 196.34 196.34 20.23 196.34 20.23 20.23 196.34 20.23 196.34 46.55 216.57 46.55 216.57 0 0 0 0 216.57 216.57 216.57 216.57 170.02 196.34 170.02"></polygon><polygon points="291.06 130.37 291.06 86.57 291.06 86.57 291.06 67.43 291.06 67.43 291.06 67.43 267.11 67.43 267.11 67.43 187.74 67.43 187.74 67.43 163.67 67.43 163.67 67.43 163.67 67.43 163.61 67.63 145.71 123.91 126.1 67.43 104.02 67.43 84.42 123.91 66.45 67.43 41.91 67.43 71.97 149.62 95.57 149.62 114.83 92.44 133.97 149.62 157.8 149.62 180.77 86.57 211.67 86.57 211.67 149.62 235.62 149.62 235.62 86.57 267.11 86.57 267.11 149.62 346.37 149.62 346.37 130.37 291.06 130.37"></polygon></svg>				</p>
<h4>
							Outcome<br />
					</h4>
<p>Despite very short mid-week possessions of only two hours, and slightly longer Saturday shifts, the works were delivered on time and to a high standard. The completed netting provides long-term stability and safety for the railway.</p>
<p>The post <a href="https://wtlgroup.co.uk/projects/rock-netting-works-at-salterhebble-halifax/">Rock Netting Works at Salterhebble Halifax</a> appeared first on <a href="https://wtlgroup.co.uk">WTL Group</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Protecting Slopes at Normanton</title>
		<link>https://wtlgroup.co.uk/projects/protecting-slopes-at-normanton/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Wed, 03 Dec 2025 11:19:09 +0000</pubDate>
				<guid isPermaLink="false">https://wtl2.thelogomark.co.uk/?post_type=projects&#038;p=1195</guid>

					<description><![CDATA[<p>Protecting Slopes at Normanton WTL returned to Normanton near Wakefield following earlier vegetation clearance works completedin 2019. After the embankment had been regraded and hydro-seeded by a specialist contractor, wewere tasked with installing anerosion control blanket to stabilise the slope. Our Approach Using 300mm wooden pins supplied by the manufacturer, we rolled out the erosion [&#8230;]</p>
<p>The post <a href="https://wtlgroup.co.uk/projects/protecting-slopes-at-normanton/">Protecting Slopes at Normanton</a> appeared first on <a href="https://wtlgroup.co.uk">WTL Group</a>.</p>
]]></description>
										<content:encoded><![CDATA[<h1>Protecting Slopes at Normanton</h1>
<p>WTL returned to Normanton near Wakefield following earlier vegetation clearance works completedin 2019. After the embankment had been regraded and hydro-seeded by a specialist contractor, wewere tasked with installing anerosion control blanket to stabilise the slope.</p>
<p>				<svg xmlns="http://www.w3.org/2000/svg" id="uuid-bd946c5e-4d4e-4424-bf11-6a3c319ca351" width="346.37" height="216.57" viewBox="0 0 346.37 216.57"><polygon points="196.34 170.02 196.34 196.34 20.23 196.34 20.23 20.23 196.34 20.23 196.34 46.55 216.57 46.55 216.57 0 0 0 0 216.57 216.57 216.57 216.57 170.02 196.34 170.02"></polygon><polygon points="291.06 130.37 291.06 86.57 291.06 86.57 291.06 67.43 291.06 67.43 291.06 67.43 267.11 67.43 267.11 67.43 187.74 67.43 187.74 67.43 163.67 67.43 163.67 67.43 163.67 67.43 163.61 67.63 145.71 123.91 126.1 67.43 104.02 67.43 84.42 123.91 66.45 67.43 41.91 67.43 71.97 149.62 95.57 149.62 114.83 92.44 133.97 149.62 157.8 149.62 180.77 86.57 211.67 86.57 211.67 149.62 235.62 149.62 235.62 86.57 267.11 86.57 267.11 149.62 346.37 149.62 346.37 130.37 291.06 130.37"></polygon></svg>				</p>
<h4>
							Our Approach<br />
					</h4>
<p>Using 300mm wooden pins supplied by the manufacturer, we rolled out the erosion control blanket with a 75mm overlap to ensure full coverage. At the crest of the embankment, our team excavated a150mm x 150mm anchor trench with a 1.5t JCB. This trench secured the blanket firmly at the top edge, preventing slippage and ensuring long-term performance</p>
<p>				<svg xmlns="http://www.w3.org/2000/svg" id="uuid-bd946c5e-4d4e-4424-bf11-6a3c319ca351" width="346.37" height="216.57" viewBox="0 0 346.37 216.57"><polygon points="196.34 170.02 196.34 196.34 20.23 196.34 20.23 20.23 196.34 20.23 196.34 46.55 216.57 46.55 216.57 0 0 0 0 216.57 216.57 216.57 216.57 170.02 196.34 170.02"></polygon><polygon points="291.06 130.37 291.06 86.57 291.06 86.57 291.06 67.43 291.06 67.43 291.06 67.43 267.11 67.43 267.11 67.43 187.74 67.43 187.74 67.43 163.67 67.43 163.67 67.43 163.67 67.43 163.61 67.63 145.71 123.91 126.1 67.43 104.02 67.43 84.42 123.91 66.45 67.43 41.91 67.43 71.97 149.62 95.57 149.62 114.83 92.44 133.97 149.62 157.8 149.62 180.77 86.57 211.67 86.57 211.67 149.62 235.62 149.62 235.62 86.57 267.11 86.57 267.11 149.62 346.37 149.62 346.37 130.37 291.06 130.37"></polygon></svg>				</p>
<h4>
							Safe Access and Installation<br />
					</h4>
<p>Our operatives hold IRATA Level 1, 2, and 3 rope access qualifications, enabling safe setup and movement across the steep slope. Working from ropes, the team rolled and pinned the blanket in place with precision. The combination of rope access skills with vegetation management training, including chainsaw and brush cutter use, highlights WTL’s ability to deliver complex works safely and efficiently</p>
<p>				<svg xmlns="http://www.w3.org/2000/svg" id="uuid-bd946c5e-4d4e-4424-bf11-6a3c319ca351" width="346.37" height="216.57" viewBox="0 0 346.37 216.57"><polygon points="196.34 170.02 196.34 196.34 20.23 196.34 20.23 20.23 196.34 20.23 196.34 46.55 216.57 46.55 216.57 0 0 0 0 216.57 216.57 216.57 216.57 170.02 196.34 170.02"></polygon><polygon points="291.06 130.37 291.06 86.57 291.06 86.57 291.06 67.43 291.06 67.43 291.06 67.43 267.11 67.43 267.11 67.43 187.74 67.43 187.74 67.43 163.67 67.43 163.67 67.43 163.67 67.43 163.61 67.63 145.71 123.91 126.1 67.43 104.02 67.43 84.42 123.91 66.45 67.43 41.91 67.43 71.97 149.62 95.57 149.62 114.83 92.44 133.97 149.62 157.8 149.62 180.77 86.57 211.67 86.57 211.67 149.62 235.62 149.62 235.62 86.57 267.11 86.57 267.11 149.62 346.37 149.62 346.37 130.37 291.06 130.37"></polygon></svg>				</p>
<h4>
							Outcome<br />
					</h4>
<p>The completed works provided a strong erosion control solution, protecting the regraded slope and supporting the client’s long-term maintenance strategy.</p>
<p>The post <a href="https://wtlgroup.co.uk/projects/protecting-slopes-at-normanton/">Protecting Slopes at Normanton</a> appeared first on <a href="https://wtlgroup.co.uk">WTL Group</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Holding the Ground at Crossgates</title>
		<link>https://wtlgroup.co.uk/projects/holding-the-ground-at-crossgates/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Wed, 03 Dec 2025 11:16:15 +0000</pubDate>
				<guid isPermaLink="false">https://wtl2.thelogomark.co.uk/?post_type=projects&#038;p=1190</guid>

					<description><![CDATA[<p>Holding the Ground at Crossgates WTL recently completed important works at Crossgates Station in Leeds. The project combined two key tasks: clearing heavy vegetation from the platform side cutting and installing rock fall netting to secure the retaining walls on the opposite side of the bridge. Vegetation Clearance and Drilling Our team began by removing [&#8230;]</p>
<p>The post <a href="https://wtlgroup.co.uk/projects/holding-the-ground-at-crossgates/">Holding the Ground at Crossgates</a> appeared first on <a href="https://wtlgroup.co.uk">WTL Group</a>.</p>
]]></description>
										<content:encoded><![CDATA[<h1>Holding the Ground at Crossgates</h1>
<p>WTL recently completed important works at Crossgates Station in Leeds. The project combined two key tasks: clearing heavy vegetation from the platform side cutting and installing rock fall netting to secure the retaining walls on the opposite side of the bridge.</p>
<p>				<svg xmlns="http://www.w3.org/2000/svg" id="uuid-bd946c5e-4d4e-4424-bf11-6a3c319ca351" width="346.37" height="216.57" viewBox="0 0 346.37 216.57"><polygon points="196.34 170.02 196.34 196.34 20.23 196.34 20.23 20.23 196.34 20.23 196.34 46.55 216.57 46.55 216.57 0 0 0 0 216.57 216.57 216.57 216.57 170.02 196.34 170.02"></polygon><polygon points="291.06 130.37 291.06 86.57 291.06 86.57 291.06 67.43 291.06 67.43 291.06 67.43 267.11 67.43 267.11 67.43 187.74 67.43 187.74 67.43 163.67 67.43 163.67 67.43 163.67 67.43 163.61 67.63 145.71 123.91 126.1 67.43 104.02 67.43 84.42 123.91 66.45 67.43 41.91 67.43 71.97 149.62 95.57 149.62 114.83 92.44 133.97 149.62 157.8 149.62 180.77 86.57 211.67 86.57 211.67 149.62 235.62 149.62 235.62 86.57 267.11 86.57 267.11 149.62 346.37 149.62 346.37 130.37 291.06 130.37"></polygon></svg>				</p>
<h4>
							Vegetation Clearance and Drilling<br />
					</h4>
<p>Our team began by removing substantial vegetation that was obstructing the platform cutting. Once cleared, we moved to drilling works on the retaining walls. Using a Marini drill rig mounted on a Road Rail Vehicle (RRV) during Saturday night possessions, alongside hand-operated pneumatic drills, we installed dowels and anchors to support the netting. Anchors were resin-bonded in place, before netting was lowered down the wall face and secured with top and bottom cables fixed with D-shackles.</p>
<p>				<svg xmlns="http://www.w3.org/2000/svg" id="uuid-bd946c5e-4d4e-4424-bf11-6a3c319ca351" width="346.37" height="216.57" viewBox="0 0 346.37 216.57"><polygon points="196.34 170.02 196.34 196.34 20.23 196.34 20.23 20.23 196.34 20.23 196.34 46.55 216.57 46.55 216.57 0 0 0 0 216.57 216.57 216.57 216.57 170.02 196.34 170.02"></polygon><polygon points="291.06 130.37 291.06 86.57 291.06 86.57 291.06 67.43 291.06 67.43 291.06 67.43 267.11 67.43 267.11 67.43 187.74 67.43 187.74 67.43 163.67 67.43 163.67 67.43 163.67 67.43 163.61 67.63 145.71 123.91 126.1 67.43 104.02 67.43 84.42 123.91 66.45 67.43 41.91 67.43 71.97 149.62 95.57 149.62 114.83 92.44 133.97 149.62 157.8 149.62 180.77 86.57 211.67 86.57 211.67 149.62 235.62 149.62 235.62 86.57 267.11 86.57 267.11 149.62 346.37 149.62 346.37 130.37 291.06 130.37"></polygon></svg>				</p>
<h4>
							Anchor Installation<br />
					</h4>
<p>During daytime shifts, compressed air drills were used to bore anchors to a depth of around two metres at the top of the retaining wall. Hollow threaded bars were then set in place and secured with a specialist grout mix, filling each void completely for maximum stability.</p>
<p>Our IRATA-trained rope access technicians created a safe working system by attaching to palisade posts at the top of the wall. This setup allowed operatives to work securely across the entire area, clipping on and off the safety line as required.</p>
<p>				<svg xmlns="http://www.w3.org/2000/svg" id="uuid-bd946c5e-4d4e-4424-bf11-6a3c319ca351" width="346.37" height="216.57" viewBox="0 0 346.37 216.57"><polygon points="196.34 170.02 196.34 196.34 20.23 196.34 20.23 20.23 196.34 20.23 196.34 46.55 216.57 46.55 216.57 0 0 0 0 216.57 216.57 216.57 216.57 170.02 196.34 170.02"></polygon><polygon points="291.06 130.37 291.06 86.57 291.06 86.57 291.06 67.43 291.06 67.43 291.06 67.43 267.11 67.43 267.11 67.43 187.74 67.43 187.74 67.43 163.67 67.43 163.67 67.43 163.67 67.43 163.61 67.63 145.71 123.91 126.1 67.43 104.02 67.43 84.42 123.91 66.45 67.43 41.91 67.43 71.97 149.62 95.57 149.62 114.83 92.44 133.97 149.62 157.8 149.62 180.77 86.57 211.67 86.57 211.67 149.62 235.62 149.62 235.62 86.57 267.11 86.57 267.11 149.62 346.37 149.62 346.37 130.37 291.06 130.37"></polygon></svg>				</p>
<h4>
							Final Fixings<br />
					</h4>
<p>Seventeen anchors were installed and grouted at the top of the retaining wall, with another seventeen set into the trackside bottom using the Marini rig. Bars were locked in position with resin capsules, which hardened within 90 seconds once activated by the turmag. With anchor points secure, the netting was tensioned and fastened to provide lasting protection against rock falls.</p>
<p>The post <a href="https://wtlgroup.co.uk/projects/holding-the-ground-at-crossgates/">Holding the Ground at Crossgates</a> appeared first on <a href="https://wtlgroup.co.uk">WTL Group</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Heritage Fencing for Leeds Station</title>
		<link>https://wtlgroup.co.uk/projects/heritage-fencing-for-leeds-station/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Wed, 03 Dec 2025 11:12:47 +0000</pubDate>
				<guid isPermaLink="false">https://wtl2.thelogomark.co.uk/?post_type=projects&#038;p=1185</guid>

					<description><![CDATA[<p>Heritage Fencing for Leeds Station WTL were appointed by Buckingham Group Ltd to carry out perimeter works at Leeds Station’s Princess Car Park. The project involved replicating and replacing fencing that had been in place for over half a century, while also delivering new access, handrail, and safety features for the remodelled station. Bespoke Steel [&#8230;]</p>
<p>The post <a href="https://wtlgroup.co.uk/projects/heritage-fencing-for-leeds-station/">Heritage Fencing for Leeds Station</a> appeared first on <a href="https://wtlgroup.co.uk">WTL Group</a>.</p>
]]></description>
										<content:encoded><![CDATA[<h1>Heritage Fencing for Leeds Station</h1>
<p>WTL were appointed by Buckingham Group Ltd to carry out perimeter works at Leeds Station’s Princess Car Park. The project involved replicating and replacing fencing that had been in place for over half a century, while also delivering new access, handrail, and safety features for the remodelled station.</p>
<p>				<svg xmlns="http://www.w3.org/2000/svg" id="uuid-bd946c5e-4d4e-4424-bf11-6a3c319ca351" width="346.37" height="216.57" viewBox="0 0 346.37 216.57"><polygon points="196.34 170.02 196.34 196.34 20.23 196.34 20.23 20.23 196.34 20.23 196.34 46.55 216.57 46.55 216.57 0 0 0 0 216.57 216.57 216.57 216.57 170.02 196.34 170.02"></polygon><polygon points="291.06 130.37 291.06 86.57 291.06 86.57 291.06 67.43 291.06 67.43 291.06 67.43 267.11 67.43 267.11 67.43 187.74 67.43 187.74 67.43 163.67 67.43 163.67 67.43 163.67 67.43 163.61 67.63 145.71 123.91 126.1 67.43 104.02 67.43 84.42 123.91 66.45 67.43 41.91 67.43 71.97 149.62 95.57 149.62 114.83 92.44 133.97 149.62 157.8 149.62 180.77 86.57 211.67 86.57 211.67 149.62 235.62 149.62 235.62 86.57 267.11 86.57 267.11 149.62 346.37 149.62 346.37 130.37 291.06 130.37"></polygon></svg>				</p>
<h4>
							Bespoke Steel Fencing<br />
					</h4>
<p>The main challenge was to replicate the original steel fencing to maintain the character of the station. Working with a local fabricator, we measured, designed, and produced 16 new panels and matching posts. Each panel was built from mild steel, welded to exact dimensions, powder-coated in gloss black, and weighed around 160kg. Posts added a further 20kg each. Within a week, a template was approved, and fabrication began.</p>
<p>Installation took around a week and a half. Where possible, we re-used existing panels to preserve the authentic look, blending old and new seamlessly.</p>
<p>				<svg xmlns="http://www.w3.org/2000/svg" id="uuid-bd946c5e-4d4e-4424-bf11-6a3c319ca351" width="346.37" height="216.57" viewBox="0 0 346.37 216.57"><polygon points="196.34 170.02 196.34 196.34 20.23 196.34 20.23 20.23 196.34 20.23 196.34 46.55 216.57 46.55 216.57 0 0 0 0 216.57 216.57 216.57 216.57 170.02 196.34 170.02"></polygon><polygon points="291.06 130.37 291.06 86.57 291.06 86.57 291.06 67.43 291.06 67.43 291.06 67.43 267.11 67.43 267.11 67.43 187.74 67.43 187.74 67.43 163.67 67.43 163.67 67.43 163.67 67.43 163.61 67.63 145.71 123.91 126.1 67.43 104.02 67.43 84.42 123.91 66.45 67.43 41.91 67.43 71.97 149.62 95.57 149.62 114.83 92.44 133.97 149.62 157.8 149.62 180.77 86.57 211.67 86.57 211.67 149.62 235.62 149.62 235.62 86.57 267.11 86.57 267.11 149.62 346.37 149.62 346.37 130.37 291.06 130.37"></polygon></svg>				</p>
<h4>
							Additional Works<br />
					</h4>
<ul>
<li>
										Installed Paladin fencing around the line &#8211; side car park perimeter , finished in black with electronic pedestrian gates and a 4m vehicular gate
									</li>
<li>
										Fixed more than 175m of GRP handrail, resin &#8211; bolted to kerbs with all joints riveted for strength and safety
									</li>
<li>
										Completed the car park with galvanised Armco barriers to protect vehicles and pedestrians
									</li>
</ul>
<p>				<svg xmlns="http://www.w3.org/2000/svg" id="uuid-bd946c5e-4d4e-4424-bf11-6a3c319ca351" width="346.37" height="216.57" viewBox="0 0 346.37 216.57"><polygon points="196.34 170.02 196.34 196.34 20.23 196.34 20.23 20.23 196.34 20.23 196.34 46.55 216.57 46.55 216.57 0 0 0 0 216.57 216.57 216.57 216.57 170.02 196.34 170.02"></polygon><polygon points="291.06 130.37 291.06 86.57 291.06 86.57 291.06 67.43 291.06 67.43 291.06 67.43 267.11 67.43 267.11 67.43 187.74 67.43 187.74 67.43 163.67 67.43 163.67 67.43 163.67 67.43 163.61 67.63 145.71 123.91 126.1 67.43 104.02 67.43 84.42 123.91 66.45 67.43 41.91 67.43 71.97 149.62 95.57 149.62 114.83 92.44 133.97 149.62 157.8 149.62 180.77 86.57 211.67 86.57 211.67 149.62 235.62 149.62 235.62 86.57 267.11 86.57 267.11 149.62 346.37 149.62 346.37 130.37 291.06 130.37"></polygon></svg>				</p>
<h4>
							Outcome<br />
					</h4>
<p>The project was completed to a high standard, retaining the station’s heritage feel while delivering durable, modern safety measures.</p>
<p>The post <a href="https://wtlgroup.co.uk/projects/heritage-fencing-for-leeds-station/">Heritage Fencing for Leeds Station</a> appeared first on <a href="https://wtlgroup.co.uk">WTL Group</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Bridge Security Works at Long Eaton</title>
		<link>https://wtlgroup.co.uk/projects/bridge-security-works-at-long-eaton/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Wed, 03 Dec 2025 11:10:23 +0000</pubDate>
				<guid isPermaLink="false">https://wtl2.thelogomark.co.uk/?post_type=projects&#038;p=1177</guid>

					<description><![CDATA[<p>Bridge Security Works at Long Eaton WTL partnered with Construction Marine Ltd to install new galvanised palisade fencing beneath a railway bridge at Long Eaton. The goal was to secure the area while protecting the integrity of the bridge structure. Project Scope The works were scheduled to be completed within one week. Using our on-site [&#8230;]</p>
<p>The post <a href="https://wtlgroup.co.uk/projects/bridge-security-works-at-long-eaton/">Bridge Security Works at Long Eaton</a> appeared first on <a href="https://wtlgroup.co.uk">WTL Group</a>.</p>
]]></description>
										<content:encoded><![CDATA[<h1>Bridge Security Works at Long Eaton</h1>
<p>WTL partnered with Construction Marine Ltd to install new galvanised palisade fencing beneath a railway bridge at Long Eaton. The goal was to secure the area while protecting the integrity of the bridge structure.</p>
<p>							<a href="https://wtlgroup.co.uk/wp-content/uploads/2025/12/WTL-Group-1.jpg" data-elementor-open-lightbox="yes" data-elementor-lightbox-slideshow="016408f" data-elementor-lightbox-title="WTL Group 1" data-e-action-hash="#elementor-action%3Aaction%3Dlightbox%26settings%3DeyJpZCI6MTUwMiwidXJsIjoiaHR0cHM6XC9cL3d0bDIudGhlbG9nb21hcmsuY28udWtcL3dwLWNvbnRlbnRcL3VwbG9hZHNcLzIwMjVcLzEyXC9XVEwtR3JvdXAtMS5qcGciLCJzbGlkZXNob3ciOiIwMTY0MDhmIn0%3D"><br />
														</a><br />
							<a href="https://wtlgroup.co.uk/wp-content/uploads/2025/12/wtl-group-crossgate.jpg" data-elementor-open-lightbox="yes" data-elementor-lightbox-slideshow="016408f" data-elementor-lightbox-title="wtl group crossgate" data-e-action-hash="#elementor-action%3Aaction%3Dlightbox%26settings%3DeyJpZCI6MTUzMSwidXJsIjoiaHR0cHM6XC9cL3d0bDIudGhlbG9nb21hcmsuY28udWtcL3dwLWNvbnRlbnRcL3VwbG9hZHNcLzIwMjVcLzEyXC93dGwtZ3JvdXAtY3Jvc3NnYXRlLmpwZyIsInNsaWRlc2hvdyI6IjAxNjQwOGYifQ%3D%3D"><br />
														</a><br />
							<a href="https://wtlgroup.co.uk/wp-content/uploads/2025/12/WTL-Group-2.jpg" data-elementor-open-lightbox="yes" data-elementor-lightbox-slideshow="016408f" data-elementor-lightbox-title="WTL Group 2" data-e-action-hash="#elementor-action%3Aaction%3Dlightbox%26settings%3DeyJpZCI6MTUwMSwidXJsIjoiaHR0cHM6XC9cL3d0bDIudGhlbG9nb21hcmsuY28udWtcL3dwLWNvbnRlbnRcL3VwbG9hZHNcLzIwMjVcLzEyXC9XVEwtR3JvdXAtMi5qcGciLCJzbGlkZXNob3ciOiIwMTY0MDhmIn0%3D"><br />
														</a><br />
							<a href="https://wtlgroup.co.uk/wp-content/uploads/2025/12/WTL-Group-3.jpg" data-elementor-open-lightbox="yes" data-elementor-lightbox-slideshow="016408f" data-elementor-lightbox-title="WTL Group 3" data-e-action-hash="#elementor-action%3Aaction%3Dlightbox%26settings%3DeyJpZCI6MTUwMCwidXJsIjoiaHR0cHM6XC9cL3d0bDIudGhlbG9nb21hcmsuY28udWtcL3dwLWNvbnRlbnRcL3VwbG9hZHNcLzIwMjVcLzEyXC9XVEwtR3JvdXAtMy5qcGciLCJzbGlkZXNob3ciOiIwMTY0MDhmIn0%3D"><br />
														</a></p>
<h4>
							Project Scope<br />
					</h4>
<p>The works were scheduled to be completed within one week. Using our on-site welders, we built the palisade fencing in-situ, carefully shaping it to follow the curved head of the bridge and adjoining sides</p>
<h4>
							Construction Process<br />
					</h4>
<p>To avoid placing stress on the bridge walls, the fencing was designed as a free-standing structure. Posts were chemically anchored into a concrete base that had been poured prior to our arrival, ensuring stability and strength. Once in place, the fencing provided a secure barrier while maintaining the bridge’s structural integrity.</p>
<h4>
							Outcome<br />
					</h4>
<p>The works were delivered efficiently and to a high standard. The new palisade fencing achieved complete security for the area beneath the bridge, with a durable resin floor-bolted framework that ensures long-term performance.</p>
<p>The post <a href="https://wtlgroup.co.uk/projects/bridge-security-works-at-long-eaton/">Bridge Security Works at Long Eaton</a> appeared first on <a href="https://wtlgroup.co.uk">WTL Group</a>.</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
